CCN Construction conducts project management activities, especially in the design and construction of prestigious and large-scale superstructure projects in which CCN Group acts as an investor. Specialized in the design and construction of integrated health campuses.
Ankara Bilkent City Hospital, which is the largest Public-Private Partnership project in health in Turkey and has the title of being the largest hospital in world constructed as one piece; received the Best Infrastructure Finance Award among 100 candidates by the Bonds & Loans Turkey Awards-2015.
Mersin City Hospital, with a capacity of 1,300 beds, completed in a short period of 25 months on an area of 374.813 m2, constructed by our company which stands out with its prestigious and large-scale projects both in Turkey and abroad; is the first project in our country to be completed with the Public Private Partnership model.
TR Ministry of Health Service building, constructed in Ankara Bilkent, on 40.627 m2 of land with 120.779 m2 of closed area was opened on 2 August 2017.
Flame Towers, which can be described as the first skyscrapers of Azerbaijan, take its name from the form of the towers. The complex has a closed area of 251,000 m2 and consists of 3 high towers and podium sections with a shopping center in the middle.
Flame Towers, composed of structures with different functions; The 37-storey Hotel Tower, which reaches a height of 207,55 meters, includes a 39-storey Residential Tower that reaches 231,37 meters, a 34-storey Office Tower that reaches 200,43 meters, a podium section and a 7-storey shopping center that reaches 28,65 meters.
Baku, the capital of Azerbaijan, hosted a masterpiece designed by Zaha Hadid, one of the most famous architects in the world. Total construction area of Haydar Aliyev Cultural Center, of which construction was completed by DIA Holding, has a construction area of 101,144 m2.
With its library, museum, concert hall, media center, art galleries, artificial lake and lake cafeteria, Haydar Aliyev Cultural Center is a structure that will brand its name on the cultural history of Azerbaijan.
Shahdag Tourism Complex, open all season and at an altitude of approximately 1,600 m on the outskirts of Shahdag; is a facility that can able to serve 5000 persons per day, available for summer and winter sports and involves the one and the only skiing resort of Azerbaijan.
47 projects of which construction started in June 2010 by DIA Holding were completed in December 2014. Shahdağ Tourism Complex, which has a closed area of 74.000 m2 in Gusar, the pupil of the Caucasus, has quickly become one of the favorite centers of the region. All infrastructure works of Shahdağ Ski Resort with the first and only ski slope of Azerbaijan and all infrastructure piping and cabling works of the complex were carried out by DIA Holding.
Bakü Premium Villas consists of 53 villas, each with its own unique design. The concept consists of luxurious and extra luxurious villas with closed construction areas ranging from 950 m² to 1,150 m².
Located on the coast of the peninsula Amburan, Bilgeh Villas project has closed area of 81,000 m2. The project, which consists of 80 exclusive villas, were initiated by DIA Construction in the fourth quarter of 2008 and completed and delivered in third quarter of 2009.
Azerbaijan State Coast Facilities with a closed area of 23.000 m2 and composed of residence building, central building, technical building, sports building, water tank. Construction of the project started in the first quarter of 2007 by DIA Holding and completed phase by phase in the second quarter of 2008 with a record speed.
Ankara Bilkent City Hospital, which is the largest Public-Private Partnership project in health in Turkey and has the title of being the largest hospital in world constructed as one piece; received the Best Infrastructure Finance Award among 100 candidates by the Bonds & Loans Turkey Awards-2015.
Mersin City Hospital, with a capacity of 1,300 beds, completed in a short period of 25 months on an area of 374.813 m2, constructed by our company which stands out with its prestigious and large-scale projects both in Turkey and abroad; is the first project in our country to be completed with the Public Private Partnership model.
TR Ministry of Health Service building, constructed in Ankara Bilkent, on 40.627 m2 of land with 120.779 m2 of closed area was opened on 2 August 2017.
Flame Towers, which can be described as the first skyscrapers of Azerbaijan, take its name from the form of the towers. The complex has a closed area of 251,000 m2 and consists of 3 high towers and podium sections with a shopping center in the middle.
Flame Towers, composed of structures with different functions; The 37-storey Hotel Tower, which reaches a height of 207,55 meters, includes a 39-storey Residential Tower that reaches 231,37 meters, a 34-storey Office Tower that reaches 200,43 meters, a podium section and a 7-storey shopping center that reaches 28,65 meters.
Baku, the capital of Azerbaijan, hosted a masterpiece designed by Zaha Hadid, one of the most famous architects in the world. Total construction area of Haydar Aliyev Cultural Center, of which construction was completed by DIA Holding, has a construction area of 101,144 m2.
With its library, museum, concert hall, media center, art galleries, artificial lake and lake cafeteria, Haydar Aliyev Cultural Center is a structure that will brand its name on the cultural history of Azerbaijan.
Shahdag Tourism Complex, open all season and at an altitude of approximately 1,600 m on the outskirts of Shahdag; is a facility that can able to serve 5000 persons per day, available for summer and winter sports and involves the one and the only skiing resort of Azerbaijan.
47 projects of which construction started in June 2010 by DIA Holding were completed in December 2014. Shahdağ Tourism Complex, which has a closed area of 74.000 m2 in Gusar, the pupil of the Caucasus, has quickly become one of the favorite centers of the region. All infrastructure works of Shahdağ Ski Resort with the first and only ski slope of Azerbaijan and all infrastructure piping and cabling works of the complex were carried out by DIA Holding.
Bakü Premium Villas consists of 53 villas, each with its own unique design. The concept consists of luxurious and extra luxurious villas with closed construction areas ranging from 950 m² to 1,150 m².
Located on the coast of the peninsula Amburan, Bilgeh Villas project has closed area of 81,000 m2. The project, which consists of 80 exclusive villas, were initiated by DIA Construction in the fourth quarter of 2008 and completed and delivered in third quarter of 2009.
Azerbaijan State Coast Facilities with a closed area of 23.000 m2 and composed of residence building, central building, technical building, sports building, water tank. Construction of the project started in the first quarter of 2007 by DIA Holding and completed phase by phase in the second quarter of 2008 with a record speed.
CCN Construction conducts project management activities, especially in the design and construction of prestigious and large-scale superstructure projects in which CCN Group acts as an investor. Specialized in the design and construction of integrated health campuses.
Ankara Bilkent City Hospital, which is the largest Public-Private Partnership project in health in Turkey and has the title of being the largest hospital in world constructed as one piece; received the Best Infrastructure Finance Award among 100 candidates by the Bonds & Loans Turkey Awards-2015.
Mersin City Hospital, with a capacity of 1,300 beds, completed in a short period of 25 months on an area of 374.813 m2, constructed by our company which stands out with its prestigious and large-scale projects both in Turkey and abroad; is the first project in our country to be completed with the Public Private Partnership model.
TR Ministry of Health Service building, constructed in Ankara Bilkent, on 40.627 m2 of land with 120.779 m2 of closed area was opened on 2 August 2017.
Flame Towers, which can be described as the first skyscrapers of Azerbaijan, take its name from the form of the towers. The complex has a closed area of 251,000 m2 and consists of 3 high towers and podium sections with a shopping center in the middle.
Flame Towers, composed of structures with different functions; The 37-storey Hotel Tower, which reaches a height of 207,55 meters, includes a 39-storey Residential Tower that reaches 231,37 meters, a 34-storey Office Tower that reaches 200,43 meters, a podium section and a 7-storey shopping center that reaches 28,65 meters.
Baku, the capital of Azerbaijan, hosted a masterpiece designed by Zaha Hadid, one of the most famous architects in the world. Total construction area of Haydar Aliyev Cultural Center, of which construction was completed by DIA Holding, has a construction area of 101,144 m2.
With its library, museum, concert hall, media center, art galleries, artificial lake and lake cafeteria, Haydar Aliyev Cultural Center is a structure that will brand its name on the cultural history of Azerbaijan.
Shahdag Tourism Complex, open all season and at an altitude of approximately 1,600 m on the outskirts of Shahdag; is a facility that can able to serve 5000 persons per day, available for summer and winter sports and involves the one and the only skiing resort of Azerbaijan.
47 projects of which construction started in June 2010 by DIA Holding were completed in December 2014. Shahdağ Tourism Complex, which has a closed area of 74.000 m2 in Gusar, the pupil of the Caucasus, has quickly become one of the favorite centers of the region.
All infrastructure works of Shahdağ Ski Resort with the first and only ski slope of Azerbaijan and all infrastructure piping and cabling works of the complex were carried out by DIA Holding.
Bakü Premium Villas consists of 53 villas, each with its own unique design. The concept consists of luxurious and extra luxurious villas with closed construction areas ranging from 950 m² to 1,150 m².
Located on the coast of the peninsula Amburan, Bilgeh Villas project has closed area of 81,000 m2. The project, which consists of 80 exclusive villas, were initiated by DIA Construction in the fourth quarter of 2008 and completed and delivered in third quarter of 2009.
Azerbaijan State Coast Facilities with a closed area of 23.000 m2 and composed of residence building, central building, technical building, sports building, water tank.
Construction of the project started in the first quarter of 2007 by DIA Holding and completed phase by phase in the second quarter of 2008 with a record speed.
Ankara Bilkent City Hospital, which is the largest Public-Private Partnership project in health in Turkey and has the title of being the largest hospital in world constructed as one piece; received the Best Infrastructure Finance Award among 100 candidates by the Bonds & Loans Turkey Awards-2015.
Mersin City Hospital, with a capacity of 1,300 beds, completed in a short period of 25 months on an area of 374.813 m2, constructed by our company which stands out with its prestigious and large-scale projects both in Turkey and abroad; is the first project in our country to be completed with the Public Private Partnership model.
TR Ministry of Health Service building, constructed in Ankara Bilkent, on 40.627 m2 of land with 120.779 m2 of closed area was opened on 2 August 2017.
Flame Towers, which can be described as the first skyscrapers of Azerbaijan, take its name from the form of the towers. The complex has a closed area of 251,000 m2 and consists of 3 high towers and podium sections with a shopping center in the middle.
Flame Towers, composed of structures with different functions; The 37-storey Hotel Tower, which reaches a height of 207,55 meters, includes a 39-storey Residential Tower that reaches 231,37 meters, a 34-storey Office Tower that reaches 200,43 meters, a podium section and a 7-storey shopping center that reaches 28,65 meters.
Baku, the capital of Azerbaijan, hosted a masterpiece designed by Zaha Hadid, one of the most famous architects in the world. Total construction area of Haydar Aliyev Cultural Center, of which construction was completed by DIA Holding, has a construction area of 101,144 m2.
With its library, museum, concert hall, media center, art galleries, artificial lake and lake cafeteria, Haydar Aliyev Cultural Center is a structure that will brand its name on the cultural history of Azerbaijan.
Shahdag Tourism Complex, open all season and at an altitude of approximately 1,600 m on the outskirts of Shahdag; is a facility that can able to serve 5000 persons per day, available for summer and winter sports and involves the one and the only skiing resort of Azerbaijan.
47 projects of which construction started in June 2010 by DIA Holding were completed in December 2014. Shahdağ Tourism Complex, which has a closed area of 74.000 m2 in Gusar, the pupil of the Caucasus, has quickly become one of the favorite centers of the region.
All infrastructure works of Shahdağ Ski Resort with the first and only ski slope of Azerbaijan and all infrastructure piping and cabling works of the complex were carried out by DIA Holding.
Bakü Premium Villas consists of 53 villas, each with its own unique design. The concept consists of luxurious and extra luxurious villas with closed construction areas ranging from 950 m² to 1,150 m².
Located on the coast of the peninsula Amburan, Bilgeh Villas project has closed area of 81,000 m2. The project, which consists of 80 exclusive villas, were initiated by DIA Construction in the fourth quarter of 2008 and completed and delivered in third quarter of 2009.
Azerbaijan State Coast Facilities with a closed area of 23.000 m2 and composed of residence building, central building, technical building, sports building, water tank.
Construction of the project started in the first quarter of 2007 by DIA Holding and completed phase by phase in the second quarter of 2008 with a record speed.